Floor nine is poured
Concrete for floor nine set over two nights. The crane moves up next week.
Floor 09
Read
Facade samples on site
Three brick bonds mocked up on the north wall. Buyers vote in December.
Facade
Read
Floors seven and eight
Two floors in five weeks, the fastest pour of the build so far.
Floor 08
Read
Lift shafts topped out
Both lift cores reach floor ten ahead of the slabs.
Core
Read
Parking level sealed
Waterproofing tested, underground levels are dry.
−2